Whatsapp: +8615936220108
Email: [email protected]
News
Under the background of the country's vigorous promotion of ‘carbon peak’ and ‘carbon neutrality’, the new energy industry is developing rapidly, and from September 2021 onwards, wind power projects have entered a new round of lifting peak.Jinli Heavy Industry's two generations of products, JLD1700 and JLD2250, have been put into wind power hoisting services.
As a leader in the domestic wind power tower crane industry, Jinli Heavy Industry has launched the "After-Sales Service Thousand Miles Tour" in order to comprehensively enhance the customer experience and provide an extra layer of lifting safety protection for customers. It goes to the construction site to assist customers with tower crane installation guidance and safe construction operation training.
The first stop of this activity is Fengqiu, Henan Province, the main crane on the site of this project is Jinli Heavy Industry JLD2250 wind turbine tower crane, its lifting task is to complete the highest 165 metres of 4MW steel tower wind turbine produced by Goldwind Science and Technology, which is the first of its kind in Asia. As it was the first time for the construction company to use the tower crane for wind power lifting, the after-sales service personnel patiently explained each step of tower crane disassembling and assembling and safety precautions, and the after-sales team instructed the construction team to disassemble and assemble the tower crane during the disassembling and assembling process, which provided a strong guarantee for the customer to complete the lifting and assembling task on time.
After the completion of the Fengqiu project, Jinli Heavy Section after -sales service staff reached the construction site of 160 meters 4.5MW Yunda truss fan in Jiaozhou, Shandong. Under the guidance of the after -sales service team at the scene, the JLD2250 wind power tower machine has entered the hanging stage. The service staff of Wanlixing guided the on -site construction personnel to conduct a routine tower safety inspection and maintenance guidance to ensure the safety hanging of the project.
"After -sales", the horsepower came to the hanging project of the 155 -meter hybrid tower fan in Tianmen, Hubei. The construction platform of the project was small. Recommend the layout and lifting scheme for users at the scene, which provides support for the smooth construction of the project.
In the subsequent itinerary, the "after -sales" team has reached the construction site of the 152 -meter wind farm project of Jiangsu Baoying 152 meters, the 142m wind power project of Xianyang Shaanxi, and the 140 -meter wind power project construction site of Henan Xinyang. After the Golden Lishe after -sales service personnel arrived at various scenes, relying on their strong professional knowledge and sincere service attitude, they made every effort to ensure the safe and smooth progress of the construction of each project.
During the after -sales activities, Jinli Heavy Section after -sales service staff fully showed professional technical capabilities and enthusiastic service attitudes, and won unanimous praise from customers and people on the spot. The principle of achieving customer value as its own "principle, adhere to such meaningful activities, and constantly walk on the way to solve problems for customers.
We are here to help you
You are welcome to : phone call, Message, Wechat, Email& Seaching us, etc.
Email: [email protected]
Phone / Whatsapp: +8615936220108
Our professional team will reply you as soon as possible.
Submit Request
PDF Request
Simply fill out the form below and the catalog will be available for download!