Whatsapp: +8615936220108
Email: [email protected]
5.0MW-160m Wind Farm in Qitaihe Heilongjiang
Location: Qitaihe City, Heilongjiang Province, China Hub Height:160mCapacity: 5MWType of Tower: Reinforced concrete tower barrel The wind power project in Qitaihe, Heilongjiang faces challenges including…
6.25MW-150m Wind Farm in Hengyang Hunan
Location: Hengyang City, Hunan Province, China Hub Height:150mCapacity: 6.25MWType of Tower: Reinforced concrete tower barrel The 6.25MW mountain wind power project in Hengyang, Hunan is…
6.7MW JLL560 Wind Turbine Major Component Replacement System in Liu Yuan
On June 8, 2025, the JLL560 Wind Turbine Major Component Replacement System, jointly developed by Jinli Heavy Tech and Goldwind, successfully completed China’s first live test at the Liuyuan Wind Farm in Gansu Province.
4.5MW-185m Wind Farm in Zhanjiang Guangdong
Location: Zhanjiang City, Guangdong Province, China
Hub Height:185m
Capacity: 4.5MW
Type of Tower: Concrete hybrid tower barrel
Our professional team will reply you as soon as possible.
Submit Request
PDF Request
Simply fill out the form below and the catalog will be available for download!