塔筒类型:钢制塔筒河南南阳山风电项目是山区典型的新能源项目,计划安装多台2.XMW至3.XMW级别的风力发电机组。首台吊装的风机轮毂中心高度达132米,采用三叶片整体吊装方案,面临山地位置狭窄、作业空间受限、搬迁运输不便以及吊装参数要求高等核心难题。该项目选用金力重工的JLD1700-136t风电塔式起重机作为主力设备。该塔式起重机最大起重量达136吨,最大起升高度为183.5米,其基础间距仅为16米×16米,占地面积小、整机重量轻、拆装便捷,且采用双底座设计,完美契合山区施工需求,大大提升了移位效率。最终,该项目顺利完成了132米高风力发电机的吊装工作,吊装过程稳定精准、安全管控到位,有效破解了山地风电建设中的痛点难点,为特殊场景风电项目提供了卓越的吊装解决方案,充分彰显了金力重工的技术创新实力。
In December 2020, Jinli Heavy Industry’s JLD1700-136t wind power tower crane completed the hoisting of a 132m-height wind turbine at the Nanyang Mountain Wind Farm (Henan Province) and achieved 36-hour rapid relocation to the next site, meeting the urgent construction schedule.
The mountainous project faced critical hurdles: narrow construction sites, steep terrain (slopes over 30°), difficult transportation for large equipment, and tight deadlines (requiring readiness within 48 hours).
Key Advantages of JLD1700