JLLT Self-Hoisting Crane

  • Max. Hoisting Capacity:100t,200t
  • Max. Lifting Height:190m,200m

Self-Hositing Crane is a specialized type of wind turbine maintenance. 

Description

The JLLT560 Self-Hoisting Crane is installed in the wind turbine nacelle with the assistance of an interface system that connects the turbine and the crane. Designed for efficiency and sustainability, this crane require a minimal site footprint and no prior groundwork, making them ideal for use at complex and remote sites both onshore and offshore.

Key Features

  • 50% lower costs:
    Offshore: No jack-up vessels needed, saving $40,000+ per operation.
    Onshore: Replaces 1,200-ton crawler cranes with just a 100-ton mobile crane.
  • Safe & efficient:
    Modular design enables 40% faster assembly, with load monitoring, emergency brakes, and real-time adjustments.
  • 80% faster:
    Reduces downtime from 14–28 days to just 5–7 days, minimizing equipment failure losses.
  • Compatible With Multiple Brands of Wind Turbines
  • No Need for Main Large Crane and Outrigger Vessle

Technical Specifications

NameUnitJLLT560JLLT200t
Max. Hoisting Momentt.m7001600
Max. Hoisting Capacityt100200
Max. Lifting Heightm190200
Operating Wind Speed (10min avg.)m/s815
Non-operating Wind Speed (10 min avg.)m/s2225
Total Powerkw190270
Power Supply Requirement/380V+10%,50HZ380V+10%,50HZ
Working Temperature-20℃~+40℃-20℃~+40℃

Applications 

JLLT Self-Hoisting Crane - default

Project Overview

  • Maintenance and service operations for wind turbines require reliable solutions for handling heavy components and equipment.
  • Efficient support is essential to reduce downtime and improve maintenance efficiency.

Challenges

  • Safe handling of large turbine components during inspection, replacement, and repair operations.
  • Flexible operation in complex wind farm environments with limited working conditions.

Application

  • The Inspection Crane was applied for wind turbine maintenance, supporting component lifting, replacement, and repair operations.
  • Its flexible operation and reliable performance help reduce maintenance time and improve service efficiency.

Related Products

Related Markets

  • 6.7MW JLL560 Wind Turbine Major Component Replacement System in Liu Yuan

    On June 8, 2025, the JLL560 Wind Turbine Major Component Replacement System, jointly developed by Jinli Heavy Tech and Goldwind, successfully completed China’s first live test at the Liuyuan Wind Farm in Gansu Province.

    Read More

Leave a Message

Our professional team will reply you as soon as possible.

  • Civilian construction
  • Bridge
  • Stadium
  • Wind turbine power
  • Thermal power
  • Petrochemical
  • Others

Your email address will not be published. Required fields are marked *

Wechat

wechat

Whatsapp

whatsapp

Message

Email

Submit Request

*
*

PDF Request

Simply fill out the form below and the catalog will be available for download!

*
*